Geography of Andhra Pradesh (APPSC) · Chapter 8 · Topic 3 of 6

Power Generation Mix and Renewables

Generation assets and the renewable transition.

Electricity

Quick answer

Andhra Pradesh's electricity system combines thermal, hydro and renewable generation. Official reporting put installed capacity near 30,500 MW at the end of 2025, with renewables and hydro together close to half the total — but capacity is a stock measure, not generation or supply adequacy.

Installed capacity is a stock measure; actual generation, availability and supply adequacy vary over time.

Always quote the reporting date with a capacity figure.

Map · Andhra Pradesh

Power system anchors

13°N15°N17°N19°N77°E79°E81°E83°E85°E1. Kurnool region — solar2. Anantapur region — solar and wind3. Srisailam region — hydelPragnya IAS · present-day state lines for orientation · not an official boundary map
  1. 1. Kurnool region — solar — Regional locator only
  2. 2. Anantapur region — solar and wind — Regional locator only
  3. 3. Srisailam region — hydel — Reservoir-region locator

Illustrative city coordinates indicate regional functions, not exact plant sites.

  • Illustrative city and region points only; they do not represent boundaries or exact mine, well or facility sites.

Installed capacity by source, 31 December 2025

30,502 MW

All sources combined

15,666 MW

Thermal (coal, gas, diesel)

3,290 MW

Hydro

11,546 MW

Renewables

Where the renewable capacity sits, 30 September 2025

SourceInstalled (MW)Note
Solar5,772Ground-mounted parks dominate
Wind4,398Concentrated in the Rayalaseema plateau
Large hydro3,050Reservoir-linked stations
Bio-power594Bagasse and biomass
Small hydro163Minor stations
Total renewable13,977Includes large hydro

Generation lenses

Thermal

  • Includes state, central and private stations.
  • Coastal siting supports fuel logistics but brings environmental constraints.

Hydel

  • Srisailam Right Bank (770 MW) is the largest state-station group.
  • Lower Sileru 460 MW, Upper Sileru 240 MW, Nagarjunasagar Right Canal 90 MW and its tail pond 50 MW follow.
  • Hydropower output is affected by inflows and competing water-use priorities.

Renewables

  • Kurnool Ultra Mega Solar Park contributes 1,000 MW at Panyam.
  • NP Kunta in Anantapur reports 978.5 MW of a planned 1,500 MW.
  • Solar and wind add variable generation that needs storage and transmission.

Solar parks named in official and developer reporting

ParkDistrictCapacity (MW)Status note
Kurnool Ultra Mega Solar ParkKurnool1,000Operational; developed by APSPCL
NP KuntaAnantapur978.5 of 1,500Partly commissioned
Ananthapuramu-IITadipatri, Anantapur500Operational
GaliveeduKadapa250 of 1,000Partly commissioned

Do not conflate

Statements examiners like to twist — learn the correct version.

  • Installed MW equals annual energy supplied.

    Capacity factor, outages and hydrology determine output.

  • Every announced storage scheme is sanctioned.

    Distinguish proposal, appraisal, approval, construction and operation.

Prelims focus

  • Differentiate capacity and generation.
  • Name the largest state hydel station group.

Mains angle

  • Assess renewables' contribution to Andhra Pradesh's power mix and the balancing needs it creates.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.Installed capacity is measured as

  2. Q2.Hydel output depends strongly on

  3. Q3.Pumped storage primarily provides