Quick answer
The India Semiconductor Mission anchors a ₹76,000 crore chip ecosystem push. Economic Survey 2025-26 reports ten approved projects worth around ₹1.60 lakh crore by August 2025.
The India Semiconductor Mission (ISM) is India’s programme to develop domestic semiconductor design, manufacturing and innovation capabilities. Launched in 2021, it addresses supply concentration and technological dependence rather than merely subsidising a single chip factory.
Source: Economic Survey 2025-26, Box VIII.7 and Chart VIII.24.
Concept diagram
Why the India Semiconductor Mission Matters
A semiconductor clean room separates wafer fabrication from assembly, testing, marking and packaging.
- A packaging unit is not the same as a wafer fabrication plant.
- The mission builds capabilities across the semiconductor ecosystem.
Chip-making basics: three different capabilities
Design and fabless firms
- Design specifies architecture, power use and processing performance; a fabless company designs chips but contracts out their manufacture.
- Design capability generates intellectual property but does not itself create wafer-fabrication capacity.
Fabrication and foundries
- A fab manufactures circuits on semiconductor wafers using highly precise equipment. A foundry manufactures chips for customers.
- A modern semiconductor factory can cost around US$10 billion, according to Box VIII.7.
ATMP and OSAT
- ATMP means assembly, testing, marking and packaging; OSAT means outsourced semiconductor assembly and test.
- These downstream activities make chips usable and reliable; packaging capacity is not interchangeable with fabrication capacity.
Data chart
Chip industry R&D intensity across economies, 2024
- The US spends 17.7 per cent of sales on semiconductor R&D.
- This measures industry research intensity, not semiconductor market share or national R&D/GDP.
Source: Economic Survey 2025-26, Chart VIII.24 (State of the U.S. Semiconductor Industry 2025, SIA)
Show the data (Per cent of sales)
| Period / item | R&D expenditure / sales |
|---|---|
| United States | 17.7 |
| South Korea | 11.8 |
| Taiwan | 11.5 |
| EU27 | 10.8 |
| China | 9.2 |
| Japan | 5.7 |
Semicon India support and execution milestones
| Measure | Survey evidence | Interpretation |
|---|---|---|
| Incentive framework | ₹76,000 crore | Programme support framework; not realised output |
| Manufacturing support | 50% of project cost/capex for specified fab and assembly/test facilities | Support base depends on the applicable scheme |
| Approved manufacturing and packaging projects | 10 across 6 states, August 2025 | Approvals are not all operational factories |
| Cumulative approved-project investment | Around ₹1.60 lakh crore | Not the same as the central incentive envelope |
| Design support | Dedicated Design Linked Incentive scheme | Complements capital-intensive manufacturing support |
Box VIII.7: why supply concentration matters
Disruptions spread across sectors
- Pandemic-era shortages affected over 169 industries globally, as recalled in the box.
- Vehicles, telecom, hospitals and energy systems can all be constrained by missing chips.
Design rents are concentrated
- The US, South Korea, Taiwan and Japan together account for 79.4 per cent of global semiconductor IC design revenue in the cited study.
- The figure concerns design revenue, not total chip output.
Equipment remains a bottleneck
- The box describes key precision machinery supply as concentrated among five companies across four countries.
- The US, Japan and South Korea accounted for two-thirds of global wafer-fab, assembly and test equipment sales in 2021.
From fiscal support to a resilient chip ecosystem
Build complementary capacity
Pair fabrication and packaging projects with reliable power, ultrapure water and supplier development.
Deepen domestic knowledge
Connect the Design Linked Incentive scheme, industry R&D and specialised workforce training.
Diversify without isolating
Retain access to global equipment and technology while reducing dependence on a handful of sources.
Judge execution, not announcements
Track commissioning, yields, customer qualification and sustained commercial production.
Semiconductor distinctions that change the answer
Statements examiners like to twist — learn the correct version.
Ten project approvals mean ten fabs are producing chips.
The approvals include manufacturing and packaging; approval does not establish commissioning or output.
₹76,000 crore and ₹1.60 lakh crore measure the same spending.
The first is the incentive framework; the second is cumulative investment associated with approved projects.
Strategic autonomy requires producing every chip and machine domestically.
The Survey advocates capability depth and resilient access; global collaboration remains necessary.
Prelims focus
- ISM launched in 2021; distinguish fab, fabless, ATMP, OSAT and DLI.
- Chart VIII.24 uses R&D/sales, not R&D/GDP; the US value is 17.7 per cent in 2024.
Mains angle
- Explain semiconductors as a general-purpose input linking economic efficiency with national security.
- Evaluate subsidy-led capacity building alongside skills, infrastructure, intellectual property and measurable execution.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Chart VIII.24 measures semiconductor R&D spending relative to which denominator?
Q2.Which statement correctly interprets the August 2025 approvals?
Q3.Which activity is primarily associated with a fabless semiconductor firm?