PMGSY began in 2000 to provide all-weather road connectivity to eligible unconnected rural habitations; a habitation is not necessarily a revenue village. BRO, established in 1960, builds strategic infrastructure in difficult terrain under the Ministry of Defence.
Projects and geographical problems
| Intervention | Purpose | Exam distinction |
|---|---|---|
| PMGSY | Eligible rural habitation access; later phases include upgrading and consolidation | Not a scheme to make every village road a National Highway |
| Atal Tunnel | Bypasses the Rohtang Pass route near Manali | Snow barriers reduced, not all slope hazards removed |
| Sela Tunnel | Improves all-weather access towards Tawang, Arunachal Pradesh | Eastern Himalaya |
| Sonamarg/Z-Morh Tunnel | Improves access to Sonamarg; inaugurated in January 2025 | Distinct from the separate Zojila project |
| Zojila Tunnel project | Strategic link on the Kashmir–Ladakh axis | Describe as a project unless its completion is independently verified |
Keep an upland road usable
Locate carefully
Use geotechnical and drainage surveys before widening.
Build for terrain
Stabilise cut slopes, protect drainage and manage excavated material.
Maintain access
Monitor slips and snow; protect bridges and provide emergency alternatives.
Prelims focus
- PMGSY: 2000; BRO: 1960.
- Distinguish Atal, Sela, Sonamarg and Zojila by location and status.
Mains angle
- Evaluate rural roads as social infrastructure, with examples from tribal Telangana and remote Andhra Pradesh.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.PMGSY was launched in:
Q2.Sela Tunnel is associated with:
Q3.Which is most important for durable all-weather hill access?
