New UPSC Foundation, Optional and TGPSC/APPSC batches are open — book your counselling slot.Explore coursesGroup 2 crash course ₹9,999Today's Current AffairsToday's Daily QuizPlaces in NewsCall 98804 87071

Indian Economy · Chapter 4 · Topic 6 of 13

The LAF Corridor: SDF, Repo and MSF

Floor, policy rate and ceiling

Corridor

Quick answer

India’s operating corridor places SDF below repo and MSF above it. RBI manages liquidity to keep the weighted average call rate close to the policy repo rate.

The Liquidity Adjustment Facility corridor is the interest-rate framework used to steer overnight money-market conditions. SDF supplies a standing absorption floor, repo is the central policy signal and MSF provides a borrowing ceiling; RBI’s operating target is the weighted average call rate, not the corridor midpoint as an observed statistic.

Concept diagram

The LAF Corridor: SDF, Repo and MSF

Conceptual guide to the laf corridor: sdf, repo and msf.

  • SDF forms the floor and MSF the ceiling.
  • Liquidity management steers WACR toward the policy repo rate.

Three levels, three different functions

LevelFacilityPurpose
FloorStanding Deposit FacilityBanks place surplus funds without collateral; introduced in April 2022.
Policy signalRepo rateGuides the intended price of short-term funds.
CeilingMarginal Standing FacilityEligible scheduled commercial banks access overnight liquidity against eligible securities.

Data chart

The corridor following the October 2026 policy

0246Per centSDF floorPolicy repoMSF ceilingAdministered rate, SDF floor: 5.255.25Administered rate, Policy repo: 5.55.5Administered rate, MSF ceiling: 5.755.75

Source: RBI, MPC resolution of 7 October 2026. · The dated corridor is ±25 basis points around repo, a total width of 50 basis points. This chart does not plot actual call-market transactions.

Show the data (Per cent)
Period / itemAdministered rate
SDF floor5.25
Policy repo5.5
MSF ceiling5.75

Read the spread correctly

RelationshipOctober 2026 valueImplication
Repo − SDF25 basis pointsSurplus placement earns less than the policy rate.
MSF − repo25 basis pointsBackstop borrowing costs more than the policy rate.
MSF − SDF50 basis pointsTotal corridor width is not 25 basis points.
WACR − repoObserved daily, not fixed hereIndicates how overnight market pricing compares with the intended signal.

Bring an overnight rate back towards the signal

  1. Observe market conditions

    Persistent WACR softness can indicate abundant reserves; firmness can indicate shortage or frictions.

  2. Adjust liquidity

    Absorb surplus or provide funds through suitable auctions and standing facilities.

  3. Review alignment

    Check market segmentation, collateral access and end-of-period reserve pressures.

Why a corridor is not a rigid wall

Access conditions

  • Not every money-market participant can directly use RBI standing facilities.
  • Collateral, eligibility and operational timing influence arbitrage.

Distribution matters

  • A system-wide surplus can coexist with shortages at individual banks.
  • Market frictions can produce occasional deviations; the corridor guides rather than mechanically fixes every transaction.

Avoid these inference errors

Statements examiners like to twist — learn the correct version.

  • SDF needs RBI to provide government securities to depositing banks.

    SDF absorption is uncollateralised; this separates it from reverse repo.

  • MSF is an unsecured public emergency loan scheme.

    It is a collateralised overnight facility for eligible banks, subject to RBI conditions.

  • The corridor’s width is permanently fixed by the RBI Act.

    The operating design and spreads are policy choices and can change over time.

Prelims focus

  • SDF replaced fixed reverse repo as the standing floor in April 2022.
  • Distinguish an administered facility rate from the market-observed WACR.

Mains angle

  • Discuss how the corridor and liquidity operations jointly implement the MPC’s decision.
  • Explain why overnight rates can deviate from the policy repo rate despite standing facilities.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.The weighted average call rate is best described as:

  2. Q2.With SDF at 5.25 and MSF at 5.75 per cent, corridor width equals:

  3. Q3.Which statement about SDF is correct?

Related visual notes

Free UPSC daily current affairs quiz — 10 questions, new every day at 8 am IST.

Call nowWhatsApp