Telangana Movement · Chapter 19 · Topic 9 of 14

Corporations, Power and Transport

Schedule IX, Schedule X, electricity and RTC

Part VII

Quick answer

Part VII preserves corporations, transport and institutional access during division; the Twelfth Schedule separately protects PPAs and sets power-sharing rules.

Corporate division and service continuity are separate legal tasks. The Act keeps existing services operating while assets, personnel and regulatory arrangements are reorganised; electricity is also governed by section 92 and the Twelfth Schedule.

Real pictures

Corporations, Power and Transport in historical pictures

Jurala Project

Jurala: a Krishna-system project illustrating the distinction between generating assets and contractual electricity supply.

Image: Naidugari Jayanna · CC BY-SA 4.0 · Wikimedia Commons

Pulichinthala Project

Pulichintala: reservoir infrastructure provides context for the linked questions of water management and power administration.

Image: Sakshi TV · CC BY 4.0 · Wikimedia Commons

Map · Deccan

Electricity networks cross the new administrative divide

12°N14°N16°N18°N20°N74°E76°E78°E80°E82°E84°ESonBetwaParbatiIndravatiRaviGandakGodävariSutlejSutlejMahäna NadïMahäna NadïKrishnaKrishnaYamunaNarmadaChenabJhelumJhelumCauveryCauveryChambalChambalYarlungGhägharaDihangBrahmaputraBhimaTistaMahiTapiGangesPennerIndusIndusBrahmaniBeasBeasTungabhadraTungabhadraWaingangaBanasTelPalarLuhitKolidam1. Hyderabad2. Jurala hydropower setting3. Srisailam hydropower setting4. Nagarjuna Sagar hydropower settingPragnya IAS · present-day state lines for orientation · not an official boundary map
  1. 1. Hyderabad — Administrative setting for corporate and utility transition.
  2. 2. Jurala hydropower setting — Krishna dam reference; not a separate powerhouse survey point.
  3. 3. Srisailam hydropower setting — Dam reference; bank-specific generating assets require separate identification.
  4. 4. Nagarjuna Sagar hydropower setting — Dam reference linking water management and power supply.

Hydropower locations illustrate why plant location, contractual electricity supply and river management must be treated separately. The map does not allocate particular assets or determine entitlement to power.

  • The Twelfth Schedule divides APGENCO units geographically while continuing existing PPAs for ongoing projects and those under construction.
  • Jurala, Srisailam and Nagarjuna Sagar illustrate the relationship between reservoir operations and electricity generation; they are not a list of all generating stations.
  • Hyderabad is a city-level reference for the administrative setting, not a marker for a particular corporate asset, transport depot or dispatch centre.

Two schedules, different purposes

ProvisionRuleHow to read it
Section 68 + Schedule IXListed companies and corporations continue operating initiallyTheir assets, rights and liabilities are apportioned through section 53.
Section 75 + Schedule XListed institutions must preserve facilities for people of the other StateTerms are to be agreed within one year, otherwise fixed by the Centre.
Section 70Andhra Pradesh State Financial Corporation continues subject to directionsProvides a statutory route for reconstitution, reorganisation or dissolution.
Section 71APSRTC continues in its former service area subject to Central directionsDivision is a process, not an automatic cancellation of bus services.

Power: ownership is not the same as entitlement

Generating assets

  • APGENCO units are divided by geographical location under the Twelfth Schedule.
  • This rule concerns assets, not an unrestricted right to withdraw contracted supply.

Power purchases

  • Existing PPAs with DISCOMs continue for ongoing projects and projects under construction.
  • The Act does not replace every PPA with the population ratio.

Central generation

  • Power from Central Generating Stations is allotted using actual energy consumption of the relevant DISCOMs over the preceding five years.
  • For ten years, a deficit State has first right of refusal to purchase the other State’s surplus power.

Temporary bridges in electricity administration

ProvisionRuleHow to read it
Joint regulatorExisting APERC: not exceeding six monthsSeparate State commissions are to be formed within that period.
Load despatchExisting SLDC: not exceeding two yearsDuring the bridge period it functions under Southern RLDC, Bengaluru.
TransmissionCross-border lines of 132 kV and above deemed inter-State transmissionLines within each State pass to the respective transmission utility.
Section 69Centre may direct preservation of earlier power or water supply arrangements, so far as practicableThe provision addresses disadvantage caused by the new border.

Transport must keep moving

  1. Corporation

    Section 71 supplies the framework for APSRTC continuity and reorganisation.

  2. Permits

    Section 72 protects specified pre-existing road-transport permits, subject to the Act.

  3. Workers

    Section 73 limits compensation claims arising solely from protected transfers or re-employment, subject to safeguards on terms and continuity.

Separate the rule from the assumption

Statements examiners like to twist — learn the correct version.

  • Schedule X is a second list for mechanical asset division.

    Section 75’s central purpose is continued institutional facilities for people of the other State.

  • The Act applies consumption-based sharing to every new generating project.

    The explicit five-year consumption formula concerns power from Central Generating Stations; existing PPAs receive separate protection.

  • The Twelfth Schedule deals only with electricity.

    It covers coal, oil and gas, as well as power. It assigns SCCL equity as Telangana 51% and Union 49%.

Prelims focus

  • Sections 68, 71 and 75: corporations, APSRTC and institutional facilities respectively.
  • Section 92 links the Twelfth Schedule to energy-sector directions.
  • Distinguish generating-asset ownership from electricity-purchase obligations.

Mains angle

  • Analyse service continuity as a principle of State reorganisation.
  • Explain why integrated utility networks complicate territorial division.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.Continued facilities in institutions listed in the Tenth Schedule are governed by:

  2. Q2.The Twelfth Schedule’s consumption formula expressly concerns:

  3. Q3.Which section specifically deals with APSRTC?