Quick answer
Part VII preserves corporations, transport and institutional access during division; the Twelfth Schedule separately protects PPAs and sets power-sharing rules.
Corporate division and service continuity are separate legal tasks. The Act keeps existing services operating while assets, personnel and regulatory arrangements are reorganised; electricity is also governed by section 92 and the Twelfth Schedule.
Real pictures
Corporations, Power and Transport in historical pictures
Jurala Project
Jurala: a Krishna-system project illustrating the distinction between generating assets and contractual electricity supply.
Image: Naidugari Jayanna · CC BY-SA 4.0 · Wikimedia Commons
Pulichinthala Project
Pulichintala: reservoir infrastructure provides context for the linked questions of water management and power administration.
Image: Sakshi TV · CC BY 4.0 · Wikimedia Commons
Map · Deccan
Electricity networks cross the new administrative divide
- 1. Hyderabad — Administrative setting for corporate and utility transition.
- 2. Jurala hydropower setting — Krishna dam reference; not a separate powerhouse survey point.
- 3. Srisailam hydropower setting — Dam reference; bank-specific generating assets require separate identification.
- 4. Nagarjuna Sagar hydropower setting — Dam reference linking water management and power supply.
Hydropower locations illustrate why plant location, contractual electricity supply and river management must be treated separately. The map does not allocate particular assets or determine entitlement to power.
- The Twelfth Schedule divides APGENCO units geographically while continuing existing PPAs for ongoing projects and those under construction.
- Jurala, Srisailam and Nagarjuna Sagar illustrate the relationship between reservoir operations and electricity generation; they are not a list of all generating stations.
- Hyderabad is a city-level reference for the administrative setting, not a marker for a particular corporate asset, transport depot or dispatch centre.
Two schedules, different purposes
| Provision | Rule | How to read it |
|---|---|---|
| Section 68 + Schedule IX | Listed companies and corporations continue operating initially | Their assets, rights and liabilities are apportioned through section 53. |
| Section 75 + Schedule X | Listed institutions must preserve facilities for people of the other State | Terms are to be agreed within one year, otherwise fixed by the Centre. |
| Section 70 | Andhra Pradesh State Financial Corporation continues subject to directions | Provides a statutory route for reconstitution, reorganisation or dissolution. |
| Section 71 | APSRTC continues in its former service area subject to Central directions | Division is a process, not an automatic cancellation of bus services. |
Power: ownership is not the same as entitlement
Generating assets
- APGENCO units are divided by geographical location under the Twelfth Schedule.
- This rule concerns assets, not an unrestricted right to withdraw contracted supply.
Power purchases
- Existing PPAs with DISCOMs continue for ongoing projects and projects under construction.
- The Act does not replace every PPA with the population ratio.
Central generation
- Power from Central Generating Stations is allotted using actual energy consumption of the relevant DISCOMs over the preceding five years.
- For ten years, a deficit State has first right of refusal to purchase the other State’s surplus power.
Temporary bridges in electricity administration
| Provision | Rule | How to read it |
|---|---|---|
| Joint regulator | Existing APERC: not exceeding six months | Separate State commissions are to be formed within that period. |
| Load despatch | Existing SLDC: not exceeding two years | During the bridge period it functions under Southern RLDC, Bengaluru. |
| Transmission | Cross-border lines of 132 kV and above deemed inter-State transmission | Lines within each State pass to the respective transmission utility. |
| Section 69 | Centre may direct preservation of earlier power or water supply arrangements, so far as practicable | The provision addresses disadvantage caused by the new border. |
Transport must keep moving
Corporation
Section 71 supplies the framework for APSRTC continuity and reorganisation.
Permits
Section 72 protects specified pre-existing road-transport permits, subject to the Act.
Workers
Section 73 limits compensation claims arising solely from protected transfers or re-employment, subject to safeguards on terms and continuity.
Separate the rule from the assumption
Statements examiners like to twist — learn the correct version.
Schedule X is a second list for mechanical asset division.
Section 75’s central purpose is continued institutional facilities for people of the other State.
The Act applies consumption-based sharing to every new generating project.
The explicit five-year consumption formula concerns power from Central Generating Stations; existing PPAs receive separate protection.
The Twelfth Schedule deals only with electricity.
It covers coal, oil and gas, as well as power. It assigns SCCL equity as Telangana 51% and Union 49%.
Prelims focus
- Sections 68, 71 and 75: corporations, APSRTC and institutional facilities respectively.
- Section 92 links the Twelfth Schedule to energy-sector directions.
- Distinguish generating-asset ownership from electricity-purchase obligations.
Mains angle
- Analyse service continuity as a principle of State reorganisation.
- Explain why integrated utility networks complicate territorial division.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Continued facilities in institutions listed in the Tenth Schedule are governed by:
Q2.The Twelfth Schedule’s consumption formula expressly concerns:
Q3.Which section specifically deals with APSRTC?