Quick answer
Economic Survey 2025-26 reports 8,780 MW of nuclear capacity and a 100 GW vision for 2047, with the SHANTI Act widening participation while retaining compensation safeguards.
Nuclear power is electricity generated from controlled nuclear fission, providing dependable low-carbon supply alongside variable solar and wind. Box X.2 links expansion to the Nuclear Energy Mission, small modular reactors and the December 2025 SHANTI Act.
Concept diagram
Nuclear Energy: Scaling Up Clean Baseload Power
A nuclear generating station illustrates the role of firm power alongside renewables.
- 100 GW by 2047 is an ambition, not current capacity.
- The cooling towers symbolise heat rejection.
Basics: reliability is different from renewability
Firm power
- Nuclear fuel can support sustained generation independent of sunshine or wind, helping supply continuous industrial demand.
- Nuclear is non-fossil but not conventionally classified as renewable; uranium is a finite fuel.
Capacity and output
- MW and GW measure power capacity; MWh and GWh measure energy generated over time.
- A capacity target is not an electricity-generation share. Actual output depends on utilisation and outages.
Small modular reactors
- SMRs use smaller reactor units and modular construction approaches; deployment still requires safety review and viable supply chains.
- The Survey also identifies nuclear heat and electricity as potential inputs for hydrogen and industrial processes.
Data chart
Nuclear scale: present capacity versus 2047 vision
Source: Economic Survey 2025-26, Box X.2 (Ministry of Power; CEA) · 8,780 MW converted to 8.78 GW. The second bar is a future capacity mix estimate, not commissioned capacity.
Show the data (GW)
| Period / item | GW |
|---|---|
| Current capacity reported | 8.78 |
| 2047 capacity vision | 100 |
Box X.2: policy milestones
| Measure | Survey position | Interpretation |
|---|---|---|
| Nuclear Energy Mission | ₹20,000 crore announced in Budget 2025-26 | Mission allocation; not the cost of the entire nuclear fleet |
| Indigenous SMRs | At least five designed and operational by 2033 | Deployment objective, not current achievement |
| SHANTI Act | Adopted in December 2025 | Consolidates and modifies the Atomic Energy Act, 1962 and CLNDA, 2010 framework |
Legal opening must become bankable, safe capacity
Broaden participation
The new framework enables private-sector or state-government participation, including operations, generation, manufacturing and research.
Clarify liability
A graded liability framework addresses the earlier liability structure without diluting victim compensation, according to the Survey.
Deliver responsibly
Long project timelines require credible finance, independent safety oversight, skilled personnel and radioactive-waste management.
Common exam traps
Statements examiners like to twist — learn the correct version.
SHANTI removes liability and compensation.
Box X.2 describes graded liability, not elimination of victim compensation.
100 GW is already installed.
The Survey reports 8,780 MW currently; 100 GW relates to the 2047 capacity mix.
Non-fossil means renewable.
Nuclear is non-fossil but distinct from renewable sources such as wind and solar.
Prelims focus
- Remember SHANTI’s full name: Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India.
- Link ₹20,000 crore to the mission and at least five indigenous SMRs to 2033.
Mains angle
- Assess how nuclear can support industrial decarbonisation without displacing renewable expansion.
- Evaluate private participation against financing, safety, liability and waste-management requirements.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Which pairing is correct?
Q2.Nuclear power is best described as:
Q3.According to Box X.2, graded liability under SHANTI: