Economic Survey 2026 · Chapter 13 · Topic 9 of 14

Rural Infrastructure: Roads, Housing and Services

PMGSY, PMAY-G and basic amenities

Infrastructure

Quick answer

Economic Survey 2025-26 reports 2.93 crore PMAY-G houses completed and rural tap coverage of 81.31%, alongside PMGSY road expansion and basic-service convergence.

Rural infrastructure comprises the physical networks and household amenities that connect villages to opportunities and improve living conditions. Roads, durable housing and reliable tap water reinforce each other: better access lowers transaction costs, while secure shelter and basic services expand people’s capacity to work, study and stay healthy.

Concept diagram

A connected village is a bundle of services

Roads, secure housing and basic amenities work best as a coordinated system.

  • PMGSY improves rural connectivity; PMAY-G supports eligible rural housing.
  • Water, sanitation, electricity and maintenance shape the benefits of these assets.

Basics: access is not the same as service quality

Road connectivity

  • An all-weather road is intended to keep a habitation connected across seasons.
  • Network length, connected habitations and completed bridges measure different outputs; maintenance determines lasting usability.

Housing security

  • A pucca house improves shelter security; basic amenities determine its practical quality of life contribution.
  • A target is an intended scale, an allocation assigns responsibility, a sanction approves a house, and completion records delivery.

Water service

  • A tap connection is a physical access measure.
  • Health gains additionally require safe water, dependable supply and operation and maintenance.

Data chart

Completed road length across PMGSY phases

02,00,0004,00,0006,00,0008,00,000KilometresPMGSY-IPMGSY-IIPMGSY-IIICompleted length, PMGSY-I: 6,25,1176,25,117Completed length, PMGSY-II: 49,08749,087Completed length, PMGSY-III: 1,02,9261,02,926

Source: Economic Survey 2025-26, paragraphs 13.60–13.61 (as of 15 January 2026) · Phases differ in purpose and sanctioned scale. These are completed road lengths, not connected-household counts.

Show the data (Kilometres)
Period / itemCompleted length
PMGSY-I6,25,117
PMGSY-II49,087
PMGSY-III1,02,926

PMGSY: sanctioned versus completed road and bridge assets

PhaseRoads: sanctioned / completedRoad km: sanctioned / completedBridges: sanctioned / completed
I1,64,581 / 1,63,6656,44,735 / 6,25,1177,453 / 7,210
II6,664 / 6,61249,791 / 49,087759 / 749
III15,965 / 12,6991,22,363 / 1,02,9263,211 / 1,734

Housing and water: preserve the programme denominator

IndicatorValueReference
PMAY-G objective4.95 crore houses by 2029Paragraph 13.67
Allocated / sanctioned / completed4.14 / 3.86 / 2.93 crorePMAY-G progress reported in the Survey
Earlier-scheme houses also completed76.98 lakhSeparate from the PMAY-G completion count
Overall rural house completion3.70 crore over last 11 yearsSurvey-reported rounded combined total
JJM at launch3.23 crore households; 17%August 2019
JJM current coverageAbout 15.74 crore households; 81.31%20 November 2025

Evolution from missing links to productive networks

  1. PMGSY-I: connect

    Launched 25 December 2000 for eligible unconnected habitations: 500+ population in plains and 250+ in hilly/NE areas, using Census 2001.

  2. PMGSY-II: consolidate

    Launched in 2013 to improve the efficiency of the existing rural road network.

  3. PMGSY-III: link services

    Approved July 2019 for 1,25,000 km of routes and major rural links to agricultural markets, higher secondary schools and hospitals.

Convergence and sustainability: beyond asset counts

  • Bastar’s Kawapal–Kalguda road is 5.5 km long; 1.2 km uses non-recyclable plastic blended with bitumen, linking PMGSY with SBM-Grameen Phase II’s waste-to-wealth approach.
  • Under PM-JANMAN, 2,495 roads covering 7,324 km and 164 bridges were sanctioned; 263 roads covering 1,314 km were completed by 15 January 2026.
  • JJM added over 12.50 crore covered households from launch to November 2025. Treat public-health benefits as dependent on effective water services, not on pipe installation alone.

Exam traps: keep the distinctions clear

Statements examiners like to twist — learn the correct version.

  • 2.93 crore completed houses means the 4.95 crore PMAY-G goal is already met.

    The figures refer to different implementation stages; the overall objective runs to 2029.

  • PMGSY-I eligibility is based on each household’s income.

    The stated original criterion concerns unconnected habitations and Census 2001 population thresholds. The source later uses “households” for its 99.6% connectivity statement; do not confuse that wording with scheme eligibility.

  • All 5.5 km of the Bastar road uses plastic waste.

    The Survey specifies 1.2 km of plastic-mixed bituminous construction within the 5.5 km road.

Prelims focus

  • PMGSY phases: initial connectivity, network consolidation, and links to markets and social services.
  • PMAY-G: 4.95 crore objective by 2029; JJM: 81.31% coverage as of 20 November 2025.

Mains angle

  • Analyse complementarities between roads, housing, water services and rural productivity.
  • Discuss how maintenance, safe service delivery and local monitoring can convert infrastructure outputs into lasting welfare.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.PMGSY-III primarily focuses on:

  2. Q2.Which is the PMAY-G completion figure reported in the Survey?

  3. Q3.Which pair is correctly matched?