Quick answer
Economic Survey 2025-26 reports about 1,036 km of operational Metro/RRTS in 2025 and prioritises moving people rather than private vehicles.
Urban mobility is the ability to reach jobs, services and other people reliably, not simply the ability to drive faster. The Survey proposes high-capacity public transport, walkable access and integrated land use to reduce compulsory car dependence and enlarge effective labour markets.
Concept diagram
Move people, not just vehicles
Integrate metro and regional rapid transit with walking and feeder services. Conceptual illustration; objects and dimensions do not encode measured values.
- High-capacity public transport uses scarce corridor space efficiently.
- First- and last-mile links determine whether the network is useful door to door.
Basics: measure accessibility and person throughput
Capacity versus vehicle flow
- Person throughput counts people carried per corridor per hour, rather than vehicles passing a point.
- Low-occupancy cars use scarce street space inefficiently; parking also competes with movement.
Door-to-door connectivity
- A fast rail journey can be undermined by unsafe or slow access to the station.
- Walking, cycling and shared feeders make the first and last mile part of the transport system.
Data chart
Chart XV.10: illustrative corridor capacity
Source: Economic Survey 2025-26, Chart XV.10 (Global Energy Assessment, modified from Breithaupt, 2010) · Values read from the Survey chart; approximate. Modes identified from pictograms. The printed caption says “3.5-mile-wide lane”, an apparent unit error; use these as the chart’s illustrative comparison, not an engineering design standard.
Show the data (People per hour)
| Period / item | People per hour |
|---|---|
| Car | 2,000 |
| Bus | 9,000 |
| Bicycle | 14,000 |
| Bus rapid transit | 17,000 |
| Walking | 19,000 |
| Light rail/tram | 22,000 |
| Metro/urban rail | 80,000 |
Box XV.2: Namo Bharat as regional economic infrastructure
| Feature | Survey evidence | Why it matters |
|---|---|---|
| Corridor | 82 km; design speed up to 180 km/h; Delhi–Meerut under one hour versus 1.5–2 hours by road | Widens reachable job markets |
| Funding | Centre 20%; participating states 20%; ADB/AIIB/NDB 60% | Blends public capital and development finance |
| Shared infrastructure | Meerut Metro uses RRTS assets; about ₹6,300 crore capital saving | Avoids duplication |
| TOD townships | New Meerut 350 hectares; Harnandipuram/New Ghaziabad 541 hectares | Connects transport with mixed-use growth |
| Labour and inclusion | 166 lakh construction mandays, 2019–2025; women exceed 35% of operators and station controllers | Jobs and wider participation |
Scale has increased, but buses remain a binding gap
Rail stock and implementation status
- About 1,036 km of Metro/RRTS operational across around 24 cities in 2025.
- The Survey reports about 55 km of the 82 km first RRTS corridor in service; planned full length is not the operational length.
Bus access and PM e-Bus Sewa
- MoHUA benchmark: 40–60 buses per lakh people; around 47,650 urban buses nationally, nearly 61% in nine megacities.
- PM e-Bus Sewa targets 10,000 e-buses on PPP with ₹20,000 crore central assistance; FY25 status: 7,293 approved across 14 states and 4 UTs.
Build a network of networks
Plan jointly
Use Comprehensive Mobility Plans and UMTA arrangements under Metro Rail Policy 2017.
Integrate hubs
Connect rail, metro, buses and paratransit; Anand Vihar illustrates interchange integration.
Support station access
Provide safe footpaths, cycling routes and dependable feeders.
Link land use and finance
Apply National TOD Policy 2017 principles of mixed use, compact growth and value capture.
Exam traps: distinguish the concepts
Statements examiners like to twist — learn the correct version.
A high-capacity mode guarantees high actual ridership.
Capacity is potential throughput; actual use depends on frequency, connectivity, fares and land use.
RRTS design speed is its average operating speed.
Up to 180 km/h is a design parameter; stops and operating conditions determine journey speed.
Prelims focus
- Box XV.2: 82 km corridor; 20:20:60 financing.
- Distinguish operational, approved and proposed transport infrastructure.
Mains angle
- Discuss regional rail as a labour-market integration strategy.
- Why must metro investment be accompanied by buses, walking and TOD?
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Which has the highest illustrative capacity in Chart XV.10?
Q2.The first RRTS corridor’s financing split is:
Q3.Which best improves first–last mile access?