Economic Survey 2026 · Chapter 15 · Topic 6 of 14

Urban Mobility, Metros and the Namo Bharat RRTS

Corridor capacity and public transport

Mobility

Quick answer

Economic Survey 2025-26 reports about 1,036 km of operational Metro/RRTS in 2025 and prioritises moving people rather than private vehicles.

Urban mobility is the ability to reach jobs, services and other people reliably, not simply the ability to drive faster. The Survey proposes high-capacity public transport, walkable access and integrated land use to reduce compulsory car dependence and enlarge effective labour markets.

Concept diagram

Move people, not just vehicles

Integrate metro and regional rapid transit with walking and feeder services. Conceptual illustration; objects and dimensions do not encode measured values.

  • High-capacity public transport uses scarce corridor space efficiently.
  • First- and last-mile links determine whether the network is useful door to door.

Basics: measure accessibility and person throughput

Capacity versus vehicle flow

  • Person throughput counts people carried per corridor per hour, rather than vehicles passing a point.
  • Low-occupancy cars use scarce street space inefficiently; parking also competes with movement.

Door-to-door connectivity

  • A fast rail journey can be undermined by unsafe or slow access to the station.
  • Walking, cycling and shared feeders make the first and last mile part of the transport system.

Data chart

Chart XV.10: illustrative corridor capacity

People per hour020,00040,00060,00080,000CarPeople per hour, Car: 2,0002,000BusPeople per hour, Bus: 9,0009,000BicyclePeople per hour, Bicycle: 14,00014,000Bus rapid transitPeople per hour, Bus rapid transit: 17,00017,000WalkingPeople per hour, Walking: 19,00019,000Light rail/tramPeople per hour, Light rail/tram: 22,00022,000Metro/urban railPeople per hour, Metro/urban rail: 80,00080,000

Source: Economic Survey 2025-26, Chart XV.10 (Global Energy Assessment, modified from Breithaupt, 2010) · Values read from the Survey chart; approximate. Modes identified from pictograms. The printed caption says “3.5-mile-wide lane”, an apparent unit error; use these as the chart’s illustrative comparison, not an engineering design standard.

Show the data (People per hour)
Period / itemPeople per hour
Car2,000
Bus9,000
Bicycle14,000
Bus rapid transit17,000
Walking19,000
Light rail/tram22,000
Metro/urban rail80,000

Box XV.2: Namo Bharat as regional economic infrastructure

FeatureSurvey evidenceWhy it matters
Corridor82 km; design speed up to 180 km/h; Delhi–Meerut under one hour versus 1.5–2 hours by roadWidens reachable job markets
FundingCentre 20%; participating states 20%; ADB/AIIB/NDB 60%Blends public capital and development finance
Shared infrastructureMeerut Metro uses RRTS assets; about ₹6,300 crore capital savingAvoids duplication
TOD townshipsNew Meerut 350 hectares; Harnandipuram/New Ghaziabad 541 hectaresConnects transport with mixed-use growth
Labour and inclusion166 lakh construction mandays, 2019–2025; women exceed 35% of operators and station controllersJobs and wider participation

Scale has increased, but buses remain a binding gap

Rail stock and implementation status

  • About 1,036 km of Metro/RRTS operational across around 24 cities in 2025.
  • The Survey reports about 55 km of the 82 km first RRTS corridor in service; planned full length is not the operational length.

Bus access and PM e-Bus Sewa

  • MoHUA benchmark: 40–60 buses per lakh people; around 47,650 urban buses nationally, nearly 61% in nine megacities.
  • PM e-Bus Sewa targets 10,000 e-buses on PPP with ₹20,000 crore central assistance; FY25 status: 7,293 approved across 14 states and 4 UTs.

Build a network of networks

  1. Plan jointly

    Use Comprehensive Mobility Plans and UMTA arrangements under Metro Rail Policy 2017.

  2. Integrate hubs

    Connect rail, metro, buses and paratransit; Anand Vihar illustrates interchange integration.

  3. Support station access

    Provide safe footpaths, cycling routes and dependable feeders.

  4. Link land use and finance

    Apply National TOD Policy 2017 principles of mixed use, compact growth and value capture.

Exam traps: distinguish the concepts

Statements examiners like to twist — learn the correct version.

  • A high-capacity mode guarantees high actual ridership.

    Capacity is potential throughput; actual use depends on frequency, connectivity, fares and land use.

  • RRTS design speed is its average operating speed.

    Up to 180 km/h is a design parameter; stops and operating conditions determine journey speed.

Prelims focus

  • Box XV.2: 82 km corridor; 20:20:60 financing.
  • Distinguish operational, approved and proposed transport infrastructure.

Mains angle

  • Discuss regional rail as a labour-market integration strategy.
  • Why must metro investment be accompanied by buses, walking and TOD?

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.Which has the highest illustrative capacity in Chart XV.10?

  2. Q2.The first RRTS corridor’s financing split is:

  3. Q3.Which best improves first–last mile access?