Geography · Chapter 2 · Topic 13 of 18

India: Seismic Zones and Preparedness

Hazard maps, site effects and safer buildings

Disaster risk

A seismic zone is a design-hazard category, not an earthquake prediction. Risk also depends on people, buildings and infrastructure exposed to shaking, and their vulnerability.

Read the map with its edition

IS 1893 (Part 1):2016 categoryZone factor ZIllustrative areas; verify exact locality
II: relatively low0.10Large parts of the peninsular interior
III: moderate0.16Parts of the Peninsula and northern plains
IV: severe0.24Delhi and some Himalayan/Indo-Gangetic areas
V: very severe0.36Northeast, parts of Himalayan belt, Kachchh and Andaman–Nicobar

From a national map to local action

Code and map literacy

  • The 2016 framework has Zones II–V; there is no Zone I in that map.
  • The November 2025 notification introducing the revised code and Zone VI was withdrawn in March 2026; do not present it as an unqualified current replacement.
  • Check the BIS notification, edition and amendments when applying a design code.

Engineering and planning

  • Use site-specific studies and microzonation for soft sediment, liquefaction and slope instability.
  • Follow applicable IS 1893 design provisions and IS 13920 ductile detailing; retrofit vulnerable buildings.
  • Protect hospitals, schools, bridges and lifeline services; enforce rather than merely cite codes.

Public preparedness

  • During shaking: Drop, Cover and Hold On; stay away from windows and do not use lifts.
  • After shaking: check hazards and follow official evacuation advice, including tsunami warnings near coasts.
  • Telangana and Andhra Pradesh are not uniformly one zone; local maps and old faults matter even on the shield.

Indian and recent examples

EventGeographic lessonPreparedness connection
Koyna 1967; Latur–Killari 1993Reservoir-triggered and intraplate seismicityMonitor reservoirs and improve non-engineered construction
Bhuj 2001; Sikkim 2011; Nepal 2015Kachchh faults and Himalayan-region deformationRetrofitting, access routes and cross-border response
Türkiye–Syria, February 2023Mw 7.8 strike-slip mainshock; major subsequent eventOperation Dost; seismic design and rescue capacity
Myanmar, March 2025Mw 7.7 Sagaing strike-slip ruptureOperation Brahma; regional humanitarian logistics

Prelims focus

  • State the code edition when quoting zone categories or factors.
  • Hazard, exposure and vulnerability are different concepts.

Mains angle

  • Frame a district seismic-risk plan around mapping, enforcement, retrofitting, drills and resilient lifelines.
  • Discuss Bhuj and the 2004 Indian Ocean tsunami as part of the broader shift toward disaster-management institutions, not a single-event explanation of the 2005 Act.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.Under the 2016 Indian zoning framework, which zone has the highest factor?

  2. Q2.Which intervention directly reduces structural vulnerability?

  3. Q3.Which 2025 earthquake was associated with Operation Brahma?

Free UPSC daily current affairs quiz — 10 questions, new every day at 8 am IST.