Prevention avoids new risk, mitigation reduces unavoidable risk, preparedness organises action before impact, and response protects life immediately afterwards. Recovery restores livelihoods and services; reconstruction should make them safer. Industrial accidents such as Bhopal in 1984 also demand regulation and off-site emergency planning.
Mechanism → consequence → action
| Dimension | Core fact or process | Planning implication |
|---|---|---|
| Prevention | Keep new housing out of active drainage corridors | Land-use control |
| Mitigation | Retrofit a hospital before shaking | Engineering plus enforcement |
| Preparedness and response | Practise evacuation; then undertake rescue and triage | Clear roles and drills |
| Recovery | Restore livelihoods and rebuild accessible housing | Build back better |
Separate the concepts
Statements examiners like to twist — learn the correct version.
Preparedness and mitigation mean the same thing.
A drill prepares action; strengthening a building reduces physical vulnerability.
Disaster management starts after impact.
Development approval, maintenance and awareness should reduce risk beforehand.
Prelims focus
- Use recovery to reduce future risk while restoring livelihoods and services.
- No. It is a preparedness measure; retrofitting is structural mitigation.
Mains angle
- Organise a district plan around prevention, mitigation, preparedness, response and safer recovery; specify indicators and finance.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Which is preparedness rather than structural mitigation?
Q2.Build back better chiefly means:
Q3.Which is prevention of new exposure?