Quick answer
Economic Survey 2025-26 links cheaper data with digital adoption: monthly wireless usage reached 25.24 GB per subscriber by September 2025.
Digital and telecom infrastructure comprises communication networks, computing facilities and cloud services that carry, process and store economic information. The Survey records tele-density rising from 75.23 to 86.76 per cent over the last decade.
Concept diagram
Digital and Telecom Infrastructure
Digital connectivity combines mobile towers, fibre backhaul and village-level connections to schools, health facilities and households.
- Coverage is not the same as use, speed or service quality.
- BharatNet and mobile networks provide complementary connectivity.
Connectivity basics: access, intensity and computing
Tele-density
- Telephone connections per 100 population; multiple SIMs mean this is not the share of unique people connected.
- A BTS provides radio access; a tower can host equipment for more than one network.
Broadband and backhaul
- Broadband supports high-speed data access; backhaul links local access networks to the core network.
- BharatNet extends rural broadband infrastructure through optical fibre and satellite media; household last-mile access remains a distinct task.
Data centres and cloud
- Data centres house servers, storage and network equipment; capacity in MW describes power capacity, not stored bytes.
- Cloud computing delivers shared computing resources on demand; MeghRaj is the government GI Cloud initiative.
Data chart
IX.19: telephone connections spread beyond cities
- 2014
- 2025, to October
- Rural connections increased faster proportionately than urban connections.
- Connections are subscriptions, not unique subscribers.
Source: Economic Survey 2025-26, Chart IX.19 (Department of Telecommunications) · Values read from the Survey chart; approximate. Rounded to one decimal where needed.
Show the data (Million connections)
| Period / item | 2014 | 2025, to October |
|---|---|---|
| Total | 933 | 1,231 |
| Urban | 555 | 690 |
| Rural | 378 | 542 |
Data chart
IX.20: the transition towards broadband
- 2014
- 2025, to September
- Broadband accounts for most reported internet connections by 2025.
- These counts use crore, unlike the million-unit telecom chart.
Source: Economic Survey 2025-26, Chart IX.20 (Department of Telecommunications) · Values read from the Survey chart; approximate.
Show the data (Crore connections)
| Period / item | 2014 | 2025, to September |
|---|---|---|
| Internet | 25.2 | 102 |
| Broadband | 6.1 | 99.6 |
Data chart
IX.21: lower realised revenue per GB
- Average monthly usage rose from 0.06166 GB to 25.24 GB per wireless data subscriber.
- Revenue per GB is not the monthly bill or total operator revenue.
Source: Economic Survey 2025-26, Chart IX.21 (Department of Telecommunications)
Show the data (₹ per GB)
| Period / item | Wireless data revenue realisation |
|---|---|
| 2014 | 269 |
| September 2025 | 8.27 |
Data chart
IX.22: BharatNet Gram Panchayat connectivity
- Optical fibre laid rises from about 6.8 to 7.0 lakh km across these dates.
- High-speed broadband connections rise from 8.0 to 14.1 lakh; do not add these different indicators.
Source: Economic Survey 2025-26, Chart IX.22 (Digital Bharat Nidhi Dashboard, Department of Telecommunications) · Values read from the Survey chart; approximate. Rounding obscures small changes; the printed labels are 2.09, 2.14 and 2.15 lakh.
Show the data (Lakh Gram Panchayats)
| Period / item | Gram Panchayats connected |
|---|---|
| December 2023 | 2.1 |
| December 2024 | 2.1 |
| December 2025 | 2.2 |
Deployment and computing: dated snapshots
| Indicator | Survey observation | Interpretation |
|---|---|---|
| 5G rollout | 99.9% of districts; 5.18 lakh 5G BTS | District presence is not universal household service |
| Overall network, December 2025 | 31.87 lakh BTS; 8.48 lakh towers | Equipment and physical sites are different units |
| Data centres, June 2025 | Around 1,280 MW; about 130 private and 49 government centres | Industry estimates reported in para 9.47 |
| Data centre outlook, 2030 | Around 4 GW | Industry projection, not installed capacity today |
| MeghRaj, December 2025 | 26 empanelled Cloud Service Providers | Government cloud service delivery |
| Right of Way processing | 451 days in 2019 to 40 days in 2025 | Box IX.12: faster permissions reduce deployment friction |
From network rollout to trusted digital participation
Reduce deployment barriers
GatiShakti Sanchar and streamlined Right of Way approvals ease tower and fibre installation.
Build indigenous capability
100 5G labs, Bharat 6G Vision and TTDF support innovation; 136 TTDF projects have ₹542.23 crore funding.
Protect users
Sanchar Saathi and fraud-detection tools complement connectivity; digital trust matters for adoption.
Digital statistics: avoid denominator errors
Statements examiners like to twist — learn the correct version.
99.9% of districts means 99.9% of people have 5G.
It measures district availability, not population, area or quality coverage.
The ₹8.27 figure is monthly telecom ARPU.
It is average revenue realisation per GB of wireless data; ARPU is a different measure.
BharatNet text and chart have identical precision.
Box IX.12 reports 2.14 lakh Gram Panchayats; Chart IX.22 labels December 2025 at 2.15 lakh. Retain their separate source contexts.
Prelims focus
- Distinguish BTS, towers, tele-density, broadband and data centres.
- Link MeghRaj with GI Cloud and BharatNet with rural broadband.
Mains angle
- Explain how affordability, backhaul and digital trust jointly determine inclusion.
- Assess how domestic R&D and efficient permissions can improve telecom resilience without treating rollout counts as service quality.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Tele-density is best defined as:
Q2.Which pair is correctly matched?
Q3.A district having 5G service necessarily establishes which fact?
