Quick answer

Economic Survey 2025-26 links cheaper data with digital adoption: monthly wireless usage reached 25.24 GB per subscriber by September 2025.

Digital and telecom infrastructure comprises communication networks, computing facilities and cloud services that carry, process and store economic information. The Survey records tele-density rising from 75.23 to 86.76 per cent over the last decade.

Concept diagram

Digital and Telecom Infrastructure

Digital connectivity combines mobile towers, fibre backhaul and village-level connections to schools, health facilities and households.

  • Coverage is not the same as use, speed or service quality.
  • BharatNet and mobile networks provide complementary connectivity.

Connectivity basics: access, intensity and computing

Tele-density

  • Telephone connections per 100 population; multiple SIMs mean this is not the share of unique people connected.
  • A BTS provides radio access; a tower can host equipment for more than one network.

Broadband and backhaul

  • Broadband supports high-speed data access; backhaul links local access networks to the core network.
  • BharatNet extends rural broadband infrastructure through optical fibre and satellite media; household last-mile access remains a distinct task.

Data centres and cloud

  • Data centres house servers, storage and network equipment; capacity in MW describes power capacity, not stored bytes.
  • Cloud computing delivers shared computing resources on demand; MeghRaj is the government GI Cloud initiative.

Data chart

IX.19: telephone connections spread beyond cities

02505007501,0001,250Million connectionsTotalUrbanRural2014, Total: 9339332025, to October, Total: 1,2311,2312014, Urban: 5555552025, to October, Urban: 6906902014, Rural: 3783782025, to October, Rural: 542542
  • 2014
  • 2025, to October
  • Rural connections increased faster proportionately than urban connections.
  • Connections are subscriptions, not unique subscribers.

Source: Economic Survey 2025-26, Chart IX.19 (Department of Telecommunications) · Values read from the Survey chart; approximate. Rounded to one decimal where needed.

Show the data (Million connections)
Period / item20142025, to October
Total9331,231
Urban555690
Rural378542

Data chart

IX.20: the transition towards broadband

0255075100125Crore connectionsInternetBroadband2014, Internet: 25.225.22025, to September, Internet: 1021022014, Broadband: 6.16.12025, to September, Broadband: 99.699.6
  • 2014
  • 2025, to September
  • Broadband accounts for most reported internet connections by 2025.
  • These counts use crore, unlike the million-unit telecom chart.

Source: Economic Survey 2025-26, Chart IX.20 (Department of Telecommunications) · Values read from the Survey chart; approximate.

Show the data (Crore connections)
Period / item20142025, to September
Internet25.2102
Broadband6.199.6

Data chart

IX.21: lower realised revenue per GB

0100200300₹ per GB2014September 2025Wireless data revenue realisation, 2014: 269269Wireless data revenue realisation, September 2025: 8.278.27
  • Average monthly usage rose from 0.06166 GB to 25.24 GB per wireless data subscriber.
  • Revenue per GB is not the monthly bill or total operator revenue.

Source: Economic Survey 2025-26, Chart IX.21 (Department of Telecommunications)

Show the data (₹ per GB)
Period / itemWireless data revenue realisation
2014269
September 20258.27

Data chart

IX.22: BharatNet Gram Panchayat connectivity

00.511.522.5Lakh Gram PanchayatsDecember 2023December 2024December 2025Gram Panchayats connected, December 2023: 2.12.1Gram Panchayats connected, December 2024: 2.12.1Gram Panchayats connected, December 2025: 2.22.2
  • Optical fibre laid rises from about 6.8 to 7.0 lakh km across these dates.
  • High-speed broadband connections rise from 8.0 to 14.1 lakh; do not add these different indicators.

Source: Economic Survey 2025-26, Chart IX.22 (Digital Bharat Nidhi Dashboard, Department of Telecommunications) · Values read from the Survey chart; approximate. Rounding obscures small changes; the printed labels are 2.09, 2.14 and 2.15 lakh.

Show the data (Lakh Gram Panchayats)
Period / itemGram Panchayats connected
December 20232.1
December 20242.1
December 20252.2

Deployment and computing: dated snapshots

IndicatorSurvey observationInterpretation
5G rollout99.9% of districts; 5.18 lakh 5G BTSDistrict presence is not universal household service
Overall network, December 202531.87 lakh BTS; 8.48 lakh towersEquipment and physical sites are different units
Data centres, June 2025Around 1,280 MW; about 130 private and 49 government centresIndustry estimates reported in para 9.47
Data centre outlook, 2030Around 4 GWIndustry projection, not installed capacity today
MeghRaj, December 202526 empanelled Cloud Service ProvidersGovernment cloud service delivery
Right of Way processing451 days in 2019 to 40 days in 2025Box IX.12: faster permissions reduce deployment friction

From network rollout to trusted digital participation

  1. Reduce deployment barriers

    GatiShakti Sanchar and streamlined Right of Way approvals ease tower and fibre installation.

  2. Build indigenous capability

    100 5G labs, Bharat 6G Vision and TTDF support innovation; 136 TTDF projects have ₹542.23 crore funding.

  3. Protect users

    Sanchar Saathi and fraud-detection tools complement connectivity; digital trust matters for adoption.

Digital statistics: avoid denominator errors

Statements examiners like to twist — learn the correct version.

  • 99.9% of districts means 99.9% of people have 5G.

    It measures district availability, not population, area or quality coverage.

  • The ₹8.27 figure is monthly telecom ARPU.

    It is average revenue realisation per GB of wireless data; ARPU is a different measure.

  • BharatNet text and chart have identical precision.

    Box IX.12 reports 2.14 lakh Gram Panchayats; Chart IX.22 labels December 2025 at 2.15 lakh. Retain their separate source contexts.

Prelims focus

  • Distinguish BTS, towers, tele-density, broadband and data centres.
  • Link MeghRaj with GI Cloud and BharatNet with rural broadband.

Mains angle

  • Explain how affordability, backhaul and digital trust jointly determine inclusion.
  • Assess how domestic R&D and efficient permissions can improve telecom resilience without treating rollout counts as service quality.

Flip & recall

Answer in your head first, then tap the card to check.

Practice MCQs

Original Prelims-style questions with explanations.

0 / 3 correct · 3 left

  1. Q1.Tele-density is best defined as:

  2. Q2.Which pair is correctly matched?

  3. Q3.A district having 5G service necessarily establishes which fact?

Free UPSC daily current affairs quiz — 10 questions, new every day at 8 am IST.

Call nowWhatsApp