Quick answer
Economic Survey 2025-26 records 1,46,572 km of National Highways and 5,364 km of operational high-speed corridors by December 2025, alongside a focus on quality.
Highway infrastructure connects production centres, markets and transport terminals through a road network whose value depends on speed, reliability and access—not length alone. The Survey marks a shift from rapid network expansion towards high-speed connectivity, better project quality and last-mile rural access.
Concept diagram
Roads and Highways
An expressway interchange connects long-distance corridors and local production centres while separating traffic flows.
- Road length alone does not capture speed, safety or reliability.
- Maintenance and feeder connections determine effective access.
Read road indicators before comparing them
Network versus construction
- Network length is a stock at a date; annual construction is a flow over a year. Neither is automatically a measure of lane-kilometres.
- High-speed corridors are not the same as all National Highways; the reported corridor total includes national and state corridors.
Connectivity versus mobility
- Connectivity asks whether a place can reach a road network; mobility concerns travel time, reliability and throughput.
- A bypass can reduce urban congestion even without a large increase in aggregate network length.
Data chart
IX.5: National Highway network expansion
Source: Economic Survey 2025-26, Chart IX.5 (MoRTH)
Show the data (km)
| Period / item | km |
|---|---|
| FY14 | 91,287 |
| FY26 (to December) | 1,46,572 |
Data chart
IX.6: Operational high-speed corridors
Source: Economic Survey 2025-26, Chart IX.6 (MoRTH)
Show the data (km)
| Period / item | km |
|---|---|
| FY14 | 550 |
| FY26 (to December) | 5,364 |
Data chart
IX.7: Average annual highway construction
Source: Economic Survey 2025-26, Chart IX.7 (MoRTH)
Show the data (km per year)
| Period / item | km per year |
|---|---|
| 2004–14 | 4,174 |
| 2014–25 | 9,704 |
Data chart
IX.8: Roads and highways capital expenditure
Source: Economic Survey 2025-26, Chart IX.8 (MoRTH)
Show the data (₹ lakh crore)
| Period / item | ₹ lakh crore |
|---|---|
| FY15 | 0.53 |
| FY26 (BE) | 3.06 |
Box IX.3: High-speed connectivity and capital recycling
| Priority | Survey position | Status distinction |
|---|---|---|
| Operational corridors | 5,364 km = 3,052 km national + 2,312 km state | December 2025 stock |
| Future HSC network | About 26,000 km by FY33; 9,366 km under implementation | Target versus work underway |
| FY26 highway construction | 10,000 km target; 4,938 km completed by 31 December 2025 | Part-year achievement |
| Asset monetisation | ₹1.52 lakh crore cumulatively via TOT and private InvITs | First public InvIT planned for 2026 |
| Three-year road PPP pipeline | 13,400 km, estimated ₹8.3 lakh crore | Identified projects, not completed roads |
| Urban integration | Ring roads and bypass policy for cities above 1 lakh population | Land pooling and value capture support cost sharing |
Deliver better roads, not merely cheaper bids
Prepare alignments
Use mandated drone surveys, fixed-cost bidding and performance ratings in preparation.
Build for quality
Tighten eligibility, require additional security for low bids and deploy intelligent machine-aided construction.
Standardise and monitor
Mandate pre-cast non-critical components in projects above ₹300 crore; use drone analytics and AI-assisted defect detection.
Join economic nodes
Prioritise ports, inland-waterway terminals and industrial corridors to strengthen multimodal links.
Rural inclusion complements trunk corridors
PMGSY coverage and its denominator
- Over 99.7% of eligible habitations were connected by 31 December 2025—not 99.7% of every settlement in India.
- PM-JANMAN targets 8,000 km of roads during 2023–28 for Particularly Vulnerable Tribal Groups; 1,242.41 km had been completed by the reporting date.
PMGSY-IV
- Launched September 2024, it targets 25,000 unconnected habitations and 62,500 km of roads and bridges during FY25–FY29.
- Estimated cost is ₹70,125 crore. GIS surveys and convergence with DA-JGUA prioritise high-ST-population habitations.
Road-network claims that need qualification
Statements examiners like to twist — learn the correct version.
All 5,364 km of HSCs are national corridors.
The total includes 2,312 km of state HSCs.
4,938 km is the full-year FY26 target.
It is construction completed by December; the annual target is 10,000 km.
99.7% coverage means every rural settlement is connected.
The coverage denominator is eligible habitations under the programme.
Prelims focus
- Remember NH stock, HSC composition and the different construction comparison periods.
- TOT and InvIT monetisation recycle operating-asset value; public InvIT launch was prospective.
Mains angle
- Evaluate the shift from kilometre targets to logistics outcomes, safety and lifecycle quality.
- Explain how rural roads and trunk corridors jointly improve economic integration.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.The Survey’s 5,364 km HSC total includes:
Q2.Which pair correctly states average annual construction?
Q3.PMGSY coverage above 99.7% refers to: