Quick answer
Economic Survey 2025-26 Chapter 9 revision: ₹11.21 lakh crore FY26 budgeted capex, 99.1% rail electrification and 164 airports anchor the infrastructure story.
Chapter 9 explains how public investment, diversified finance and integrated networks can improve competitiveness and access. Revise the sequence from capital spending to assets to reliable services, keeping every figure’s period, unit and status attached: an allocation, approved project and operating asset are different facts.
Concept diagram
Chapter 9 Quick Revision: Infrastructure
An open revision notebook and pencil pair a four-item checklist—capex, finance, PPP and service—with transport, energy, digital, water and space connections on the facing page.
- Do not equate capex allocations with completed assets or outcomes.
- Connect transport, energy, digital and basic services in analytical answers.
Key numbers: retain the date and statistical status
| Indicator | Survey value | Period / source |
|---|---|---|
| Union government capex | ₹11.21 lakh crore | FY26 BE; Chart IX.1 |
| NH network / operational high-speed corridors | 146,572 km / 5,364 km | Up to December 2025; Charts IX.5–IX.6 |
| Rail network / electrification | 69,439 route-km / 99.1% | March 2025 / October 2025; para 9.24 |
| Rail capex | ₹2.65 lakh crore | FY26 BE; Chart IX.10 |
| Airport count / passenger traffic | 164 / 412 million | 2025 / FY25; para 9.28 |
| Air cargo | 3.72 MMT | FY25; Chart IX.11 |
| Port cargo / capacity | 1,602 / 2,771 MMT | FY25 provisional; Chart IX.13 |
| Inland waterway cargo | 146 MMT | FY25; para 9.34 |
| Installed power / renewable capacity | 509.74 GW / 253.96 GW | November 2025; Chart IX.15 and renewable section |
| Rural daily power supply | 22.6 hours | FY25; Chart IX.16 |
| AT&C losses | 15.04% | FY25; Box IX.10 |
| Wireless data use | 25.24 GB per subscriber per month | September 2025; digital and telecom section |
| Rural household tap connections | Over 15.76 crore | 1 December 2025; JJM section |
| Dam register / space assets | 6,628 dams / 56 active space assets | Water resources section / para 9.56 |
Fifteen one-line chapter facts
- Public capex can crowd in enterprise when useful networks reduce costs.
- Long-gestation infrastructure needs diverse sources of patient capital.
- PPPs are delivery and risk-sharing arrangements, not costless public assets.
- Road policy is shifting from network expansion towards logistics efficiency and quality.
- Freight corridors, signalling and station access complement railway electrification.
- UDAN’s 657 operationalised routes connect 93 airports including heliports and water aerodromes.
- Port turnaround time and capacity measure different dimensions of performance.
- Waterway cargo reached 146 MMT in FY25; urban Water Metro serves a different market.
- Installed power in GW is not electricity generation in GWh.
- Distribution reform joins metering, billing and consumer accountability.
- Storage shifts renewable energy across time rather than creating primary energy.
- Fibre and mobile coverage need quality, affordability and use to create value.
- A tap connection must translate into reliable, safe household water service.
- River restoration, irrigation and dam safety belong to integrated water management.
- Space reform links public missions, private innovation and useful Earth-observation services.
Terms to decode before using the numbers
Spending and finance
- BE is a budget estimate, not realised spending; capex creates assets or reduces liabilities.
- InvITs pool infrastructure assets; REITs pool income-producing real estate. Asset monetisation can recycle capital from existing assets.
PPP toolkit
- VGF addresses a project’s viability gap; IIPDF supports project development; PPPAC appraises PPP proposals. They are not interchangeable schemes.
- A bankable project has a credible repayment framework and manageable allocated risks, not simply a government announcement.
Engineering and service units
- Route-km counts routes, not every parallel railway track; MMT measures cargo mass; GW measures power capacity.
- AT&C losses combine technical and commercial energy losses with collection inefficiency. A lower loss ratio is not the same as universal uninterrupted supply.
Data chart
Headline transport expansion: like-for-like network counts
Source: Economic Survey 2025-26, Charts IX.5–IX.6 (Ministry of Roads, Transport & Highways) · Both are up to December 2025. High-speed corridors include national and state corridors; do not add these bars as mutually exclusive networks.
Show the data (Km)
| Period / item | Km |
|---|---|
| National highways | 1,46,572 |
| High-speed corridors | 5,364 |
Data chart
Headline service indicator: rural daily electricity supply
Source: Economic Survey 2025-26, Chart IX.16 (Ministry of Power) · Chapter headline indicator in its own unit; it is not a percentage or installed generating capacity.
Show the data (Hours per day)
| Period / item | Hours per day |
|---|---|
| FY14 | 12.5 |
| FY25 | 22.6 |
A mains answer in four linked steps
Investment
Use the capex push to establish scale, while retaining the FY26 BE qualifier.
Institutional delivery
Explain integrated planning, prepared projects and PPP risk allocation rather than listing schemes alone.
Sector complements
Link freight corridors with terminals, renewable power with storage, and rural taps with dependable water sources.
Outcomes
Conclude with reliability, competitiveness, inclusion and resilience as the tests of investment success.
Exam traps: separate the measures
Statements examiners like to twist — learn the correct version.
All infrastructure figures refer to the same FY26 date.
The chapter mixes FY25 totals, FY26 budget estimates, dated 2025 stocks and projections. Carry the qualifier into every answer.
Renewable capacity share equals renewable electricity-generation share.
The Survey’s 49.83% figure relates to installed capacity in November 2025, not generation over a year.
Airport capacity of 575 million equals actual traffic.
Annual capacity is approximate; FY25 passengers handled were 412 million.
Identified, sanctioned and commissioned mean the same thing.
They mark different project stages; corridor pipelines and station lists are not completed assets.
Bigger port capacity necessarily means faster vessel turnaround.
Capacity is potential throughput; turnaround measures time in port and also depends on operations and inland evacuation.
Prelims focus
- Revise unit pairs: GW versus GWh, MMT versus passengers, route-km versus track-km, and BE versus actual.
- Match PM GatiShakti, Kavach, UDAN, Digi Yatra, JJM and IN-SPACe with their functions.
- For statement questions, test date, denominator and status before testing the magnitude.
Mains angle
- “Infrastructure investment delivers growth through integration and quality, not scale alone.” Build an answer across transport, power, digital and water.
- Discuss how patient finance, project preparation, fair risk allocation and maintenance can sustain the public capex impulse.
- Use the conclusion’s decarbonisation–digitalisation–resilience priorities to connect sector examples to Viksit Bharat @2047.
Flip & recall
Answer in your head first, then tap the card to check.
Practice MCQs
Original Prelims-style questions with explanations.
0 / 3 correct · 3 left
Q1.Which pair correctly matches the figure and its status?
Q2.Consider: 1. GW measures installed power capacity. 2. MMT measures cargo mass. 3. Route-km counts every parallel track separately. Which are correct?
Q3.Which policy combination best reflects the chapter’s conclusion?